April 04 2015
- Watered various Cedar Elms
- Added water to Hay Barn Rock floor pond to protect tadpoles
- Relocated about 100 fish and 15 tadpoles from mud pond to let it dry out for redesign
Some of the Leopard Frog Tadpoles relocated from drying up mud pond
This entry was posted on Saturday April 04 2015 at 12:00 am and is filed under Census, Habitat, 2015 Journal You can follow any responses to this entry through the RSS 2.0 feed.