November 12 1998
Erosion Control
- Built swales throughout (see map)
- Trail edges, along dirt roads, wherever cedar removal happened, river bottom, tipi pasture, raccoon draw, bunny patch trail, animal step down at river bottom.
- Swales to be made are marked with survey flags.
- Built checkdams in draw
- Gabion (chicken wire filled with rock)
- Cedar poles wired to tree trunk.
- Lined up rocks across draw.
- Reseeded swales and dams in draw
- Observed rainfall events to determine critical areas of erosion to treat.
- Made signs and gave out information sheets to guests to stay on trails to prevent erosion. (See info sheet)
- Cut trail along river to south side bluff access.
This entry was posted on Thursday November 12 1998 at 1:45 pm and is filed under 1998 Journal, Erosion You can follow any responses to this entry through the RSS 2.0 feed.